In the power industry, top tying usually refers to the operation when installing optical fiber power lines (OPGW) or other power lines on top of power transmission towers.
Preparation:
Ensure that operators are equipped with relevant safety equipment, such as seat belts, safety helmets, etc.
Make sure the required tools and materials are ready, such as ropes, cable ties, tension clamps, etc.
Security check:
Confirm the structural and safety status of the power transmission tower and that the tower poles and accessories are not damaged or loose.
Installation preparation:
Pull optical power lines (OPGW) or other power lines from the ground or nearby overhead facilities to the top. This may involve the use of lifting equipment or tower climbing operations.
Fixed optical cable:
Use materials such as strapping or rope to tie fiber optic cables or power lines to the top of electrical transmission towers. This helps keep the line consistent and protects it from interference from the outside environment.
Check and test:
After installation is complete, perform final inspections and tests. Make sure all lashing and fastening parts are fast and reliable and have no looseness or other safety hazards.